The project involved construction of a 18.5 km long dedicated bus route with some segments totaling 12.5 km being constructed above grade. Cast-in-situ box girder section were used in the construction of the 12.5 km long above grade segment.

About 70% of post-tensioning related work and supplies other than strands for this project were delivered by Stronghold.

The bridge segments had 27-30m spans that were constructed with box girder sections. For post-tensioning 18/0.6″ and 21/0.6″ cables were employed. Single-end prestressing was carried out with 500 ton jacks.

The project was funded by the Government of Punjab.

It’s construction began in May 2015 and the project was completed with metro services being commenced in January 2017.